HTF Hemodialysis Service

Bank Islam Malaysia BHD

Perlis, Malaysia

  • Collection Goal

    RM6,000,000.00

  • Collection Raised

    RM6,000,000.00

Collection Raised:
100% (Completed)
Project Progress:
100% (Completed)
×

myWaqf Form

I have read and agree to the Terms and Conditions

-Minimum amount of each project is RM 10.00
-The amount should not exceed RM 30,000.00
-RM 0.50 will be charged per transaction

BACK

About the campaign creator

×
Bank Muamalat
Kelantan, Malaysia
0 Campaigns | 0 Loved campaigns

Contact Info

Social Link

Campaign Story

Sector

Health and Healthcare

Purpose

To develop a Waqf building for a Dialysis Centre (Centre) within the compound of Hospital Tuanku Fauziah (HTF), Kangar, Perlis. The Centre is a double-storey building with 1,822 m2 of floor space that can fit a capacity of 66 beds. It will be the largest dialysis Centre in Perlis and the biggest waqf development project in health sector in Malaysia.

Impact

Prior to completion of the Centre, there were only four (4) hemodialysis centers throughout the state of Perlis. With the opening of this Centre, the efficiency of treatment services is enhanced and the waiting period is shortened. For information, the construction work of the Centre commenced on 3 April 2018 and was handed over to HTF on 3 February 2020. The Centre started to receive patients on 17 August 2020. As at 31 October 2020, the number of patients who have received treatment are as follows: i. Regular patient: 163 ii. Lodger patient: 22

Breakdown Cost

Construction cost for the Centre is RM6,189,301.66. The following is the breakdown of the cost:

No Item Cost (RM)
1 Building Cost* 5,496,333.61
2 Pihak Berkuasa Tempatan (PBT) fee 2,110.00
3 Soil Investigation (SI) & Site Survey 12,266.60
4 Reimbursable charge (9%) 467,363.30
5 Site Staff (Supervision) 211,228.15
Total 6,189,301.66

*The breakdown of the building cost is as follows:

No Item Cost (RM)
1 Preliminaries 200,000.00
2 Piling Works 442,472.00
3 Building Works 1,792,211.50
4 Mechanical and Electrical 2,265,000.00
5 External Works 229,139.00
6 GST 332,067.16
7 Variation Order (VO) 235,443.95
Total 5,496,333.61

Kick off Date

06 June 2018

Appointed contractor by MAIPs

  • Main Contractor : Tg. Mahmud Architect
  • Architect : Teras QS Sdn Bhd

JMC Members

Royal Patron:
DYTM Tuanku Syed Faizuddin Putra ibni Tuanku Syed Sirajuddin Jamalullail - Yang Dipertua MAIPs

Chairman:
Dato' Dr. Faisal Ibrahim Chairman, Waqf Management Committee MAIPs

Deputy Chairman:
Ustaz Mohd Nazri Chik – General Manager Strategic Relations, BIMB

Committee Member:
1.Ustaz Mohd Nazim Mohd Noor - Chief Executive Officer, MAIPs
2.Ustaz Nazri Md Rejab - Head, Waqf Property & Mal Development, MAIPs
3.Ahmad Fauzi Mohd Akhir - Regional Office, Northern Region, Bank Islam
4.Zolkepeli Sabawas - Senior Deposit Manager, Cash Management, Bank Islam

Project Progress